Acceptance sampling uses observations from a selected sample to support a decision about a defined lot. Rather than inspecting every item, an organization may use an appropriately designed sampling plan with a specified decision rule when its requirements permit that approach. The resulting decision contains sampling risk: a lot containing unacceptable items can pass, while a relatively good lot can fail the sample rule. The original fictional examples below explain the arithmetic of single-sample attribute plans, operating characteristic curves and finite-lot probabilities. They are educational examples, not recommended inspection plans for regulated, safety-critical or actual commercial acceptance decisions.
Quick Answer
Define the lot, inspection unit, sampling method, sample size and acceptance number. Apply the declared decision rule, and evaluate how the plan’s acceptance probability changes with the underlying quality level.
Table Of Contents
- Define The Lot And Inspection Unit
- Worked Example: Apply A Single-Sample Rule
- Calculate Acceptance Probability Under A Binomial Model
- Build An Operating Characteristic Curve
- Distinguish Producer And Consumer Risks
- Worked Example: Compare Alternative Sample Plans
- Worked Example: Use A Finite Lot Model
- Avoid Convenience Sampling And Measurement Errors
- Distinguish Lot Acceptance From Process Improvement
- Reusable Acceptance Sampling Worksheet
- Frequently Asked Questions
Define The Lot And Inspection Unit
The NIST single sample acceptance plan reference describes lot acceptance sampling as a sampling scheme paired with rules for making a decision based on the sample results. Before a plan can be interpreted, the population and the observed characteristic must be defined.
A lot might be a specified group of decorative paper templates prepared under a particular arrangement. The inspection unit might be one template, classified as conforming or nonconforming in relation to an established appearance requirement. The classification rule should identify whether an item with several discrepancies is counted once as a nonconforming unit or whether individual defects are being counted under a different type of plan.
Our DPMO examples distinguish a defect count from the number of affected units. This guide uses counts of nonconforming units, not defect-opportunity counts. Mixing these quantities would make the sampling probability model inappropriate.
A lot must also be traceable. If sampled items come from several different lots, the resulting decision may not describe any one of them. Establish what the proposed sample represents and what makes the inspection method suitable before interpreting its result.
Worked Example: Apply A Single-Sample Rule
Consider a fictional stationery supplier preparing decorative blank note cards. Its teaching example concerns a noncritical visual appearance characteristic, and its illustrative plan selects 20 items from a sufficiently large group. The acceptance number is one. Under the declared rule, the lot passes the sampling decision if the number of nonconforming sampled units is zero or one. Two or more nonconforming units produce a nonacceptance decision.
| Observed Nonconforming Units | Sample Decision |
|---|---|
| 0 | Accept Under Sample Rule |
| 1 | Accept Under Sample Rule |
| 2 | Do Not Accept Under Sample Rule |
| 3 Or More | Do Not Accept Under Sample Rule |
The sample size and acceptance number must be established before the observations are examined. If the reviewer increases the acceptance number after seeing two unfavorable observations, the actual decision no longer follows the declared plan. Similarly, inspecting additional units only when a result looks inconvenient changes the probability structure unless that procedure is part of an appropriate multiple-sampling design.
A passed sample rule does not establish that every unit conforms. In this example, a sample containing one observed nonconforming unit can still pass. The individual item’s disposition and any remaining obligations need to follow the applicable arrangement rather than assume that the lot-level decision makes the known discrepancy acceptable.
Our quality control plan examples distinguish the inspection method, applicable requirement and reaction plan. Acceptance sampling should be linked to those elements instead of treated as an isolated calculation.
Calculate Acceptance Probability Under A Binomial Model
Suppose the simplified large-population model assumes that each sampled unit independently has the same probability p of being nonconforming. Let X represent the number of nonconforming units among n sampled units. Under these assumptions X follows a binomial distribution.
For a plan with acceptance number c, the probability of acceptance is the sum of the probabilities of observing zero through c nonconforming units. For the n equals 20, c equals one example, the sum contains two terms: the probability of zero nonconforming units and the probability of exactly one.
If the assumed nonconforming probability is 0.10, the probability of zero is 0.9 raised to the twentieth power, approximately 0.12158. The probability of exactly one is 20 multiplied by 0.10 and by 0.9 raised to the nineteenth power, approximately 0.27017. Adding the terms gives approximately 0.39175.
The lot therefore has a modeled acceptance probability of approximately 39.17% under the independent 10% nonconforming-probability model. Its modeled nonacceptance probability is about 60.83%. These are conditional probabilities given the assumed quality condition. They do not tell the reviewer the actual underlying nonconforming proportion of a particular lot.
Build An Operating Characteristic Curve
An operating characteristic curve, often abbreviated OC curve, displays the probability of acceptance against different modeled quality levels for a specified sampling plan. The curve helps a team understand how readily the plan distinguishes comparatively favorable and unfavorable conditions.
Using the n equals 20, c equals one example, the following values are calculated from the binomial formula. The underlying probability is varied while the sampling decision rule remains fixed.
| Assumed Nonconforming Probability | Probability Of Acceptance |
|---|---|
| 1% | 98.31% |
| 2% | 94.01% |
| 5% | 73.58% |
| 10% | 39.17% |
| 20% | 6.92% |
The probability of acceptance decreases as the assumed nonconforming probability increases. It does not fall immediately to zero once a particular quality level is exceeded. The same sampling plan can accept or fail lots with the same underlying quality condition because the selected observations vary.
The curve is a property of the model and plan. It is not a measured distribution of the supplier’s actual lot quality. To estimate actual process performance, collect suitable observations under a consistent measurement and sampling arrangement.
Our Monte Carlo simulation examples show how a probability calculation can be checked using repeated simulated observations. For a simple binomial plan, exact calculations are available and can provide a benchmark for a computational implementation.
Distinguish Producer And Consumer Risks
For this teaching example, suppose an organization identifies a relatively favorable model condition of 2% nonconforming and an unfavorable condition of 10%. These are invented comparison points, not recommended acceptable quality levels.
At the 2% condition, the example plan has an acceptance probability of approximately 94.01%. Its nonacceptance probability is approximately 5.99%. If the 2% condition is the declared favorable quality point, that latter probability illustrates the producer-side risk of nonacceptance at that point.
At the 10% condition, the plan has acceptance probability of approximately 39.17%. If that condition is the declared unfavorable quality point, this illustrates the consumer-side risk of acceptance at that point.
| Model Quality Point | Relevant Risk | Probability |
|---|---|---|
| Favorable, 2% | Nonacceptance | 5.99% |
| Unfavorable, 10% | Acceptance | 39.17% |
The two risks are evaluated at different defined quality points. Do not describe them as complementary values that must sum to 100%. For any one quality level, acceptance and nonacceptance probabilities do sum to one under this single-rule model.
An appropriate plan must be designed around the relevant requirements and consequences. A convenient sample size of 20 is not necessarily adequate. Where formal acceptance sampling standards, contractual requirements or specialized regulations apply, consult the appropriate qualified professionals and use the governing plan.
Worked Example: Compare Alternative Sample Plans
Consider two changes to the original teaching plan. One retains the sample size of 20 but reduces the acceptance number to zero. Another increases the sample size to 40 and retains acceptance number one.
| Assumed Nonconforming Probability | n=20, c=1 | n=20, c=0 | n=40, c=1 |
|---|---|---|---|
| 1% | 98.31% | 81.79% | 93.93% |
| 2% | 94.01% | 66.76% | 80.95% |
| 5% | 73.58% | 35.85% | 39.91% |
| 10% | 39.17% | 12.16% | 8.05% |
| 20% | 6.92% | 1.15% | 0.15% |
Under the stated binomial assumptions, both changed plans reduce the acceptance probability at the unfavorable 10% point. They also reduce the probability of accepting the relatively favorable 2% condition. The organization cannot judge the change solely from the reduction in unfavorable acceptance risk; it must examine both kinds of risk and the actual inspection workload.
For the n equals 40, c equals one plan, the probability of nonacceptance at 2% is approximately 19.05%. At 10%, the acceptance probability is approximately 8.05%. The changed plan makes a different trade-off from the original.
Our trade-off analysis examples explain why a decision should retain several relevant consequences. Sampling design should similarly examine how candidate rules perform at multiple meaningful quality levels and account for the resources required to implement them.
Worked Example: Use A Finite Lot Model
The binomial calculation treats each observation as an independent draw with a common nonconforming probability. Sampling without replacement from a fixed finite lot is a different model because the composition of the remaining lot changes after each draw.
Suppose a fictional lot contains 50 decorative cards, of which exactly five are nonconforming in relation to the declared characteristic. The analyst does not know which five they are. Ten distinct cards are selected uniformly at random without replacement, and the illustrative acceptance rule requires zero observed nonconforming units.
The probability that the first card conforms is 45 divided by 50. Conditional on that selection, the probability that the second conforms is 44 divided by 49. Continue in this manner through ten selections. The product is approximately 0.31056, or 31.06%.
The equivalent hypergeometric expression is the number of ways to select ten conforming cards from the 45 conforming cards divided by the number of ways to select ten cards from all 50. This formula represents the same sampling procedure without replacement.
If the binomial model were instead used with nonconforming probability of 0.10, the probability of zero in ten draws would be 0.9 raised to the tenth power, approximately 34.87%. The difference illustrates why the choice of sampling model matters when the sample is a substantial fraction of the lot.
The finite-lot example assumes the exact number of nonconforming items is fixed and the sample is uniformly selected. A real reviewer may not know the lot composition. The calculation describes acceptance probability conditional on that composition, not an inference that a particular passed lot contains exactly five nonconforming cards.
Avoid Convenience Sampling And Measurement Errors
Suppose the stationery supplier selects the first 20 cards from the top of a container because they are easy to reach. If appearance discrepancies cluster in a particular part of the lot, that convenient selection may not represent the complete group. The probability calculations above rely on the stated sampling process and cannot repair biased selection.
An appropriate sampling procedure establishes how the eligible units are identified and selected. It also needs a suitable observation method. If the reviewer frequently misclassifies the characteristic, the observed sample counts may not correspond to the assumed model of actual nonconforming units.
Our measurement system analysis examples explain how attribute agreement and measurement bias can influence observed decisions. A carefully calculated operating characteristic curve is not sufficient if the actual inspection method cannot establish the intended classification reliably.
Preserve missing or damaged sample records and follow the governing procedure for handling them. Do not silently replace an unfavorable sampled item with an easier item to examine. Such substitutions can alter the selection process and invalidate the interpretation.
Distinguish Lot Acceptance From Process Improvement
A sampling decision concerns a specified lot under a stated rule. Process improvement concerns the mechanisms generating variation or discrepancies over time. Repeatedly sampling completed lots may provide information about observed outcomes, but it does not by itself prevent the underlying discrepancy.
Suppose the card supplier discovers that mismatched appearance results occur when one approved material type is confused with another. An appropriate preventive arrangement might distinguish those materials more reliably before preparation. Our poka yoke examples explain the distinction between prevention and detection.
The organization should evaluate the process and relevant requirements rather than increase inspection effort automatically. Where the process is stable and a continuous characteristic is measured, a separate capability analysis may provide useful information. Our process capability examples discuss how observed process behavior can be compared with specification limits under suitable assumptions.
Maintain the distinction between sampled lot outcomes and the long-run rate of nonconforming units. A count of passed lots divided by all lots is not the same as the proportion of conforming individual units. Each measure has its own denominator and decision context.
Check the endpoint behavior of the calculation as a simple validation. If the modeled nonconforming probability is zero, every sample contains zero nonconforming units and the example plan accepts with probability one. If the modeled probability is one and the acceptance number is less than the sample size, every sampled unit is nonconforming and the acceptance probability is zero. A computed operating characteristic curve that fails these checks needs investigation before it is used.
Reusable Acceptance Sampling Worksheet
| Field | Record |
|---|---|
| Lot | Defined Population And Identification |
| Unit | Individual Item And Classification Rule |
| Sampling | Appropriate Selection Method |
| Decision Rule | Sample Size And Acceptance Number |
| Model | Binomial Or Suitable Finite-Lot Model |
| OC Curve | Acceptance Probabilities At Defined Quality Points |
| Risks | Nonacceptance At Favorable Point And Acceptance At Unfavorable Point |
| Response | Applicable Lot And Item Disposition |
| Verification | Measurement Suitability And Plan Applicability |
A final check should verify that the selected plan is the actual approved plan and that the observed counts can be reconciled with the sample. If 20 units are selected but only 18 can be inspected, the sample result is incomplete under the stated 20-unit rule unless the applicable procedure establishes another disposition. Do not apply the ordinary probability figures to an altered sample size without reviewing the plan.
When evaluating a sampling plan, examine the consequences of an incorrect lot decision. The cost of an additional inspection may be modest compared with a consequential incorrect acceptance, or the opposite may apply for a noncritical appearance characteristic. The examples here intentionally do not designate a universal quality level or sample size.
Acceptance sampling is useful when its decision rule and risks are understood. The calculation should support an appropriate quality arrangement rather than imply that a passed sample establishes perfect conformity. Use the actual requirements, suitable statistical design and credible inspection evidence before relying on any lot acceptance decision.
Frequently Asked Questions
What is acceptance sampling?
Using a defined sample and decision rule to support a lot acceptance decision.
What is the acceptance number?
The maximum observed nonconforming-unit count permitted by the specified single-sample rule.
What is an OC curve?
A plot of acceptance probability against modeled quality level for a given plan.
Does a passed sample prove every unit conforms?
It establishes the sample decision, not complete individual conformity.
What is producer risk?
The probability of nonacceptance at a declared favorable quality point.
What is consumer risk?
The probability of acceptance at a declared unfavorable quality point.
When is the binomial calculation appropriate?
Under the relevant independent, constant-probability assumptions or a justified approximation.
When is a hypergeometric model useful?
For uniform sampling without replacement from a fixed finite lot with defined composition.
Can a sample rule be changed after inspection?
Use the approved procedure; changing the rule afterward changes the plan’s interpretation.
Are the example plans recommended for real lots?
They are arithmetic teaching models; actual plans require applicable requirements and suitable professional design.
