Decision Making Under Uncertainty Examples: Maximin, Maximax, Laplace And Hurwicz

July 17, 2026 ·
Payoff Matrix And Four Alternative Decision Rule Scores

A decision can be important even when reliable probabilities for its possible outcomes are unavailable. A workshop may need to choose a capacity arrangement before demand becomes known; a service organization may need to select an operating policy before it understands how an external condition will develop. Under these circumstances, classical decision rules can reveal how different attitudes toward uncertain outcomes affect the choice. The original examples below compare maximin, maximax, Laplace and Hurwicz criteria, examine their sensitivity to the scenario definitions and show how to interpret the results without inventing probabilities or overlooking mandatory requirements.

Quick Answer

Build a compatible payoff table and compare decision rules such as maximin, maximax, Laplace and Hurwicz. Select the rule using the actual decision purpose and consequences, not invented probabilities.

Table Of Contents

Establish A Payoff Matrix Before Selecting A Rule

The Stanford Encyclopedia of Philosophy discussion of alternatives to expected utility describes decision rules including maximin, maximax and Hurwicz for choices under ignorance. These rules can give different recommendations because they summarize uncertain outcomes differently. They are not interchangeable calculations producing one universally correct decision.

A payoff matrix represents the result of each available action under each relevant state of the world. Actions are choices the decision maker can make. States describe uncertain circumstances that affect the result but are not selected by that decision maker. For a capacity decision, choosing a staffing arrangement is an action, whereas the demand that later arrives is a state.

Before assigning values, specify the meaning of a payoff. It might be accepted output, an operational performance score under defined assumptions or another quantity with an appropriate direction of preference. In the following teaching example, a larger payoff is preferable. Do not combine unrelated values into a single number without explaining how the trade-offs are represented.

Our decision quality examples explain why the decision frame, feasible alternatives, information and relevant values must be established before selecting a method. The payoff matrix is a representation of those assumptions, not independent evidence that every possible future has been identified.

Worked Example: Compare Four Capacity Arrangements

A fictional independent document preparation service is considering capacity arrangements for a limited project. Demand could be modest, ordinary or high. The team cannot establish reliable probabilities for these three illustrative states. Its planners estimate the number of useful accepted output units, after allowing for the relevant workload and constraints in each scenario. These numbers are invented and are not forecasts or observed operating results.

ArrangementModest DemandOrdinary DemandHigh Demand
A: Stable Arrangement505560
B: Expandable Arrangement2570110
C: Flexible Arrangement408590
D: Restricted Arrangement304050

The matrix assumes that each arrangement is eligible under the applicable requirements. It also assumes that the unit of accepted output is comparable across all cells. If one arrangement produces less reliable or inappropriate output, the figures would not establish equivalent value merely because they use the same unit label.

Arrangement D is strictly dominated by A in this illustrative table. A yields a larger payoff in every modeled state. If there are no additional relevant consequences outside the payoff definition, D cannot improve the result under any of these states. It can therefore be removed from this particular comparison. If D has a consequential advantage that the table omits, such as a substantially lower resource requirement, reconsider the decision frame rather than assume dominance has been established for the complete decision.

Calculate The Maximin Criterion

Maximin evaluates each action by its lowest modeled payoff, then selects the action with the largest of those minimum payoffs. It gives particular attention to protecting the outcome in the least favorable listed state. For arrangement A, the minimum is 50. B has a minimum of 25, C has a minimum of 40 and D has a minimum of 30.

ArrangementMinimum Payoff
A50
B25
C40
D30

The maximin choice is A because its minimum of 50 is greater than the minima of the other alternatives. This rule does not assert that modest demand is the most likely future. It simply evaluates each action according to its least favorable modeled consequence.

A is also the only arrangement in this table whose payoff is at least 50 in every listed state. However, that lower bound is conditional on the completeness and accuracy of the modeled scenarios. It is not a guarantee against all possible future conditions. An omitted disruption could produce a lower payoff even for A.

Our scenario stress testing examples explain how adverse conditions and threshold breaches can be examined. Where the worst consequence would be unacceptable, the team should investigate the actual conditions that could produce it instead of assuming that a favorable maximin result establishes resilience.

Calculate The Maximax Criterion

Maximax considers the largest payoff available under each action and selects the action with the largest of those maxima. A’s best modeled result is 60, B’s is 110, C’s is 90 and D’s is 50. B is selected because 110 is the largest best-case payoff.

ArrangementMaximum Payoff
A60
B110
C90
D50

The rule highlights the greatest modeled upside without requiring a probability for the favorable state. It does not show how likely that outcome is, and it gives no direct protection against the least favorable consequence. B can produce 110 in the high-demand scenario, but its modest-demand payoff is only 25.

Before using a maximax result, consider whether the downside can genuinely be accommodated and whether the favorable result is feasible. If the expandable arrangement requires a specialist who may not be available, the high-demand payoff may depend on another uncertain condition. Our dependency mapping examples help identify such prerequisites.

A useful decision report would state the contrast explicitly: maximin selects A, whereas maximax selects B. The disagreement is not a numerical error. The rules prioritize different aspects of the same uncertain payoff table.

Calculate The Laplace Criterion

The INFLIBNET decision theory and decision analysis learning resource discusses classical criteria including the Laplace rule. Under this rule, the listed states receive equal weights. For a payoff matrix with three states, calculate the arithmetic mean of each action’s payoffs.

A has an average of 55. B has an average of 205 divided by three, or approximately 68.33. C has an average of 215 divided by three, or approximately 71.67. D has an average of 40. C has the highest equally weighted score.

ArrangementSum Of PayoffsEqual-Weight Score
A16555.00
B20568.33
C21571.67
D12040.00

Equal weighting is an assumption or decision convention, not observed evidence that the three states are equally probable. The result can be interpreted as an expected payoff only if equal probabilities are adopted as a probability model. Without that interpretation, it remains an equally weighted scenario score.

The decision can be sensitive to how the states are divided. Suppose the high-demand state is split into two subcategories that have identical payoffs to the original high-demand state. If the four resulting columns are then weighted equally, the high-demand condition receives half the weight rather than one-third. A’s score becomes 56.25, B’s becomes 78.75 and C’s becomes 76.25. The Laplace choice changes from C to B even though the split added no new payoff distinction.

This example illustrates why scenario definitions must be justified. The number of columns in a matrix should not be allowed to manufacture evidence about the relative importance or probability of conditions. If a state is subdivided solely for descriptive convenience, preserve the intended total weight when making a comparison.

Calculate The Hurwicz Criterion

The Hurwicz criterion combines the lowest and highest payoff for each action using a specified weight. Conventions differ: some presentations define the parameter as optimism and others as pessimism. This guide explicitly uses alpha as the weight on the best payoff. The score equals alpha times the maximum payoff plus one minus alpha times the minimum payoff.

At an illustrative optimism weight of 0.4, A scores 0.4 times 60 plus 0.6 times 50, giving 54. B scores 0.4 times 110 plus 0.6 times 25, giving 59. C scores 0.4 times 90 plus 0.6 times 40, giving 60. D scores 0.4 times 50 plus 0.6 times 30, giving 38.

ArrangementMinimumMaximumHurwicz Score At Alpha 0.4
A506054
B2511059
C409060
D305038

C is preferred under this specified convention and weight. At alpha equal to zero, the rule reduces to maximin. At alpha equal to one, it reduces to maximax. Intermediate values express how the decision maker chooses to balance the two modeled extremes.

Alpha is not necessarily a probability of the best state. It is a preference weight within this rule. A value of 0.4 should not be reported as a forty-percent probability of high demand unless separate evidence establishes such a probability and the chosen model actually uses it that way.

Worked Example: Find The Weight At Which The Choice Changes

The scores for the three nondominated arrangements can be written as functions of alpha. A scores 50 plus 10 times alpha. B scores 25 plus 85 times alpha. C scores 40 plus 50 times alpha.

A and C tie when 50 plus 10 alpha equals 40 plus 50 alpha. Rearranging gives 10 equals 40 alpha, so alpha equals 0.25. At that weight, both score 52.5 and B scores 46.25.

B and C tie when 25 plus 85 alpha equals 40 plus 50 alpha. Rearranging gives 35 alpha equals 15, so alpha equals 3 divided by 7, approximately 0.428571. At that value, both score approximately 61.43, exceeding A’s score of approximately 54.29.

Optimism Weight RangePreferred Arrangement
Below 0.25A
Exactly 0.25A And C Tie
Between 0.25 And 3/7C
Exactly 3/7B And C Tie
Above 3/7B

A and B also cross at alpha equal to one-third, but C scores higher than both at that point. Finding every pairwise crossing is therefore not sufficient to identify the preferred choice: check which score is highest in each interval.

This sensitivity analysis is more informative than reporting a winner at one arbitrary weight. If the authorized decision maker has not established a clear preference about the relative importance of extreme outcomes, the table shows where that unresolved choice matters. Our assumption mapping examples describe how consequential uncertainties and assumptions can be made visible.

Adapt The Rules To Costs Instead Of Benefits

A cost table reverses the direction of preference because smaller amounts are preferable. Consider a fictional service comparing three operating arrangements using total person-minutes of additional handling effort under three possible workload conditions.

ArrangementLow Workload CostOrdinary Workload CostHigh Workload Cost
E606570
F3580115
G457085

A worst-cost-protecting rule minimizes the maximum cost. E has a maximum of 70, F has 115 and G has 85, so E is selected. A best-cost-focused rule minimizes the minimum cost, selecting F with its best result of 35. Under equal weights, E averages 65, F approximately 76.67 and G approximately 66.67, so E is selected.

These are not the same directional calculations as maximizing a benefit. One way to avoid confusion is to transform a cost into a payoff by negating it, provided lower cost is the only preference being represented. Maximizing the negative cost is equivalent to minimizing the original cost. Keep the interpretation clear so that a spreadsheet does not accidentally reward larger costs.

Our capacity planning examples demonstrate why person-time estimates must refer to the relevant resource boundaries. Lower modeled effort does not establish better overall service if an arrangement fails required quality or access conditions.

Test the stability of the scenario set itself. Suppose the document preparation service discovers a plausible fourth condition in which a shared specialist is temporarily unavailable. Under revised modeling assumptions, A produces 20 accepted units, B produces 35 and C produces 32 in that condition. The original maximin choice A now has a minimum of 20, B has a minimum of 25 and C has a minimum of 32. Maximin would now select C among those three alternatives. The decision changed because the previously omitted condition affected the alternatives differently, not because the original arithmetic was wrong. The team should establish whether the fourth condition is relevant and whether the assumed payoffs are credible before accepting the revised recommendation. If the condition can be prevented through a feasible preparatory action, include that action as another alternative rather than assume the scenario set and action set are fixed forever.

Distinguish Decision Rules From Scenario Probabilities

If credible probabilities later become available, the team can calculate an expected payoff using those probabilities. Our expected value examples explain that approach. For instance, if an independently supported model assigns probabilities of 0.5, 0.3 and 0.2 to the three demand states, A’s expected payoff becomes 53.5, B’s becomes 55.5 and C’s becomes 63.5. Under that particular probability model, C has the highest expected payoff.

The expected value calculation is not an automatic replacement for every other consideration. Some decisions involve unacceptable outcomes, uncertain probability estimates or nonlinear consequences. The organization may need to preserve constraints, examine multiple plausible probability models and consider the full distribution of consequences.

A good decision record identifies the rule and its justification before interpreting the answer. Choosing a rule retrospectively because it favors a preferred proposal undermines the purpose of analysis. Compare several rules where appropriate to understand the trade-offs, then document which decision principle the authorized decision maker considers suitable for the actual situation.

Reusable Decision Under Uncertainty Worksheet

FieldRecord
DecisionDefined Choice And Intended Outcome
ActionsFeasible Alternatives And Constraints
StatesRelevant Uncertain Conditions
PayoffsComparable Outcome Units And Assumptions
MaximinMinimum Outcome For Each Action
MaximaxMaximum Outcome For Each Action
LaplaceEqual-Weight Score And Scenario Definition
HurwiczDeclared Weight Convention And Sensitivity
ReviewMissing Conditions, Evidence And Decision Rationale

The central lesson is that a decision rule makes an attitude toward uncertain outcomes explicit. It does not remove uncertainty or establish the completeness of a scenario model. Use the payoff table to expose the consequences that matter, investigate missing information and select a decision principle suited to the actual obligations and preferences. Revisit the decision if important conditions or credible probability evidence change.

Frequently Asked Questions

What is decision making under uncertainty?

Choosing among actions when relevant future states or their probabilities are not established reliably.

What is maximin?

Select the action with the highest minimum payoff when larger payoffs are preferable.

What is maximax?

Select the action with the highest maximum payoff.

What is the Laplace rule?

Compare equally weighted payoffs across the listed states.

What is the Hurwicz criterion?

Combine the minimum and maximum payoffs using a declared preference weight.

Is the Hurwicz weight a probability?

It is a preference parameter under the stated rule, not automatically an observed scenario probability.

What is dominance?

An action is dominated when another is at least as favorable in every relevant state and better in at least one, under the declared payoff definition.

Can cost tables use these rules?

Yes, reverse the preference direction appropriately.

Why can equal weighting be sensitive to scenario definitions?

Splitting states can change their total weight if all resulting columns are weighted equally.

Which rule is universally best?

The suitable rule depends on the decision purpose, consequences, constraints and available information.