The Delphi method is a structured process for collecting and reconsidering judgments from a panel of people with relevant knowledge. Rather than relying on an unrestricted meeting where prominent participants can dominate discussion, it generally uses successive rounds of individual responses and controlled feedback. It can be useful when a decision requires informed judgment but available observations do not fully resolve the question. The fictional worked examples in this article demonstrate how rounds can be organized, how responses can be summarized and why agreement must not be confused with proof.
Quick Answer
Define the question and panel, collect independent judgments, provide controlled anonymized feedback, invite reconsideration, and report agreement and disagreement using predetermined stopping rules.
Table Of Contents
- How The Delphi Method Works
- Worked Example: Define A Planning Question
- Worked Example: Calculate Round One Results
- Provide Controlled Feedback
- Worked Example: Compare Round Two
- Define Agreement Rules Before Reviewing The Results
- Worked Example: Rate Service Requirements
- Check Attrition And Changing Denominators
- Use Disagreement As Useful Information
- Reusable Delphi Study Worksheet
- Frequently Asked Questions
How The Delphi Method Works
A methodological reference is the RAND publication on the Delphi method, available through its publication DOI. The World Bank Independent Evaluation Group’s Delphi technique example also illustrates its use for exploring uncertain future developments. Although designs vary, the recurring principles are individual judgment, iterative questioning, controlled feedback and transparent synthesis.
The purpose should be established before the panel is selected. A study seeking judgments about the likelihood of a future condition requires a different question from a study identifying the relative importance of service requirements. A panel’s agreement about importance does not establish the probability that an event will occur.
In a conventional design, participants respond independently and their individual identities are not disclosed to other panelists in association with their judgments. The facilitator may know who participated, depending on the arrangements. Controlled feedback summarizes previous responses and relevant reasons so participants can reconsider their position without being required to agree.
Our nominal group technique examples describe another structured way to collect and prioritize judgments. The Delphi method differs in its emphasis on successive rounds and controlled feedback, which may occur without a simultaneous meeting.
Worked Example: Define A Planning Question
A fictional association of small neighborhood repair businesses wants to estimate how much additional administrative capacity might be needed to introduce an agreed shared booking arrangement. Historical information exists, but several participants operate under different conditions, and there is uncertainty about the amount of preparatory work.
The facilitator defines a narrow question: how many person-hours of initial administrative preparation should a typical participating shop plan for under the stated scope? The question excludes physical repair work and ongoing administration. Each panelist receives the same scope description, including the expected preparation of an approved appointment reference, staff orientation and a representative verification exercise.
A relevant panel might include people experienced in repair-shop administration, implementation planning and customer coordination. The facilitator should document why their knowledge is relevant and identify important perspectives missing from the panel. Eight respondents do not automatically represent an entire industry simply because they have relevant experience.
Our problem definition examples explain why a clearly bounded question is essential before gathering evidence. A poorly defined Delphi question may produce disagreement because participants estimate different work rather than because they hold genuinely different judgments.
Worked Example: Calculate Round One Results
Eight fictional panelists independently estimate the required preparation effort in person-hours. Their responses are 12, 14, 16, 18, 20, 22, 26 and 32. Each participant is asked to provide a short rationale and state important assumptions.
| Panelist Code | Round One Estimate |
|---|---|
| P01 | 12 |
| P02 | 14 |
| P03 | 16 |
| P04 | 18 |
| P05 | 20 |
| P06 | 22 |
| P07 | 26 |
| P08 | 32 |
The median is the average of the fourth and fifth sorted observations, or 19 hours. Using a median-of-halves convention, the lower quartile is the average of 14 and 16, or 15 hours. The upper quartile is the average of 22 and 26, or 24 hours. The interquartile range is nine hours, and the full range is 20 hours.
A quartile calculation depends on its declared method. Our box plot examples show how different conventions can produce different quartiles, particularly for small samples. Use a consistent convention across the rounds and report the underlying counts where appropriate.
The median summarizes the center of the eight judgments. It is not a measured average preparation time from actual implementations. The range and reasoning are useful because they indicate that participants differ materially in their assumptions or expectations.
Provide Controlled Feedback
The facilitator summarizes the responses without attaching names to individual estimates. Lower estimates assume that the existing appointment reference is already current and staff are familiar with the relevant arrangement. Higher estimates allow for reconciliation of several outdated references and additional time for verification.
That explanation is more useful than simply sending the median and asking everyone to move toward it. Participants may have identified genuinely different scenarios. The facilitator can clarify the shared scope, distinguish conditions that are fixed from those that remain uncertain and invite each participant to reconsider their estimate.
Feedback should represent minority reasoning fairly. If a high estimate is supported by an important dependency that other respondents overlooked, the explanation deserves attention even though it lies far from the median. Conversely, an extreme estimate based on work outside the agreed scope may become less relevant after clarification.
Our dependency mapping examples illustrate how an overlooked prerequisite can change the feasibility of a plan. In a Delphi exercise, such a prerequisite can explain differences among informed judgments. The facilitator should preserve that information rather than remove it simply to narrow the spread.
Participants should be able to retain their original judgment where they believe the evidence supports it. Reconsideration is an opportunity to learn, not a requirement to conform.
Worked Example: Compare Round Two
The eight panelists reconsider their judgments after receiving the controlled feedback. Their fictional round two estimates, sorted, are 16, 16, 18, 18, 20, 20, 22 and 24.
| Summary | Round One | Round Two |
|---|---|---|
| Responses | 8 | 8 |
| Minimum | 12 | 16 |
| Lower Quartile | 15 | 17 |
| Median | 19 | 19 |
| Upper Quartile | 24 | 21 |
| Interquartile Range | 9 | 4 |
| Maximum | 32 | 24 |
The median remains 19 hours, while the interquartile range falls from nine to four hours. The judgments have become more concentrated under the declared quartile convention. The full range has also decreased from 20 to eight hours.
This result can indicate improved shared understanding of the question. It could also reflect pressure to agree, anchoring on the group summary or a change in how panelists interpret the scope. The numerical change alone does not establish the reason. Review the panelists’ explanations and ensure that consequential alternative assumptions have not disappeared from the synthesis.
The team should not report that 19 hours has now been independently validated as the correct amount of work. It remains a summary of the panel’s judgments. Establish the actual scope and verify preparation effort during representative implementations.
Our resource allocation examples distinguish estimated effort from the calendar feasibility of a work arrangement. Even if 19 person-hours is a reasonable planning estimate, the participating shop still needs suitable people and time.
Define Agreement Rules Before Reviewing The Results
A Delphi study can use several ways of describing agreement, depending on the question. For an ordered numerical estimate, a declared maximum interquartile range might be useful. For an importance rating, a specified proportion of responses in the upper categories might be more appropriate. The rule should be established before interpreting the results rather than selected afterward to manufacture a favorable outcome.
For the preparation-effort example, suppose the study protocol states that the exercise may end after at least two rounds if the interquartile range is no more than four hours and no major scope issue remains unresolved. Under the numerical part of that fictional rule, round two meets the threshold.
The other condition still matters. If several participants believe that the stated estimate excludes necessary verification work, a narrow spread is not sufficient to resolve the scope issue. The facilitator should document the unresolved concern and decide whether further clarification, additional evidence or another round is appropriate.
There is no universal number of rounds, panel size or consensus threshold suitable for every study. The study design needs to reflect its purpose, available resources, uncertainty and consequences. A predetermined maximum number of rounds can prevent a study from continuing indefinitely merely because the desired agreement has not appeared.
Worked Example: Rate Service Requirements
Consider a fictional ferry ticket administration team evaluating proposed changes to the information supplied during an ordinary reservation process. It asks a panel to rate the importance of clearly stating the applicable departure time using a five-point scale, with one representing very low importance and five representing very high importance.
In one round, the 12 responses are distributed as follows.
| Rating | Respondents |
|---|---|
| 1 | 0 |
| 2 | 1 |
| 3 | 2 |
| 4 | 4 |
| 5 | 5 |
| Total | 12 |
Nine of the 12 respondents select four or five, representing 75%. Suppose the protocol defines numerical agreement as at least 80% of respondents selecting those two categories. The item does not meet that agreement rule in this round, although the majority considers it important.
After controlled feedback and clarification, the next round receives ten ratings of four or five among 12 responses, or approximately 83.3%. The numerical condition is now met. Report both distributions and the actual threshold rather than simply describe the panel as unanimous.
If clearly stating the correct departure time is already an applicable requirement, a panel rating does not determine whether that requirement can be omitted. The exercise may help understand how knowledgeable participants prioritize improvements, but it does not override established obligations.
Our decision matrix examples illustrate how preferences can be compared within a declared decision framework. Such preferences should be distinguished from essential constraints.
Check Attrition And Changing Denominators
A multi-round study may lose participants. Suppose a round initially receives 12 responses, including nine ratings of four or five. In the next round, two participants do not respond. Nine of the ten remaining respondents select four or five, producing 90%.
The increase from 75% to 90% may appear to demonstrate convergence. However, the numerator is unchanged and the denominator has decreased. If the two missing responses previously came from participants with lower ratings, the apparent increase could arise from attrition rather than reconsideration.
Where possible and consistent with the study’s confidentiality arrangements, examine participation patterns using suitable anonymous or controlled identifiers. Report how many people were invited, how many responded in each round and whether comparisons concern all respondents or only those who completed both rounds.
Do not silently replace missing responses with the median or treat nonresponse as agreement. A missing response is an unresolved observation, not a demonstrated judgment. Our data stratification examples explain why changes in group composition and denominators need to be visible.
Attrition can also change the diversity of expertise. If the remaining respondents are concentrated in one type of organization, the final agreement may not represent the original range of perspectives. Describe that limitation even if the final numerical threshold is met.
Use Disagreement As Useful Information
The Delphi method is sometimes associated with consensus, but a study can produce useful results without complete agreement. In the repair-business example, persistent disagreement might reveal that shops with an established reference system require much less work than those beginning without one.
Instead of forcing all estimates toward one number, the team could define separate scenarios for the two initial conditions. It could use an appropriate panel review to estimate each scenario and explain which observations determine applicability. Our scenario planning examples show how alternative conditions can be made explicit.
This approach is especially valuable when uncertainty is structural rather than merely numerical. A difference of ten hours may reflect distinct preparation requirements. An average of those judgments can describe neither scenario particularly well. The facilitator should preserve the underlying reasons and explain how they affect the decision.
Avoid treating the panel as a substitute for direct evidence where measurement is possible. If a small pilot can establish actual preparation effort, the panel’s estimates can inform the design of the pilot and its resource allowance. The subsequent observations can then improve the planning basis.
Reusable Delphi Study Worksheet
| Field | Record |
|---|---|
| Objective | Defined Question And Intended Decision |
| Panel | Relevant Expertise And Selection Basis |
| Scope | Common Conditions, Assumptions And Exclusions |
| Round | Questionnaire Version And Response Count |
| Summary | Declared Median, Spread Or Agreement Measure |
| Feedback | Anonymized Summary And Relevant Reasons |
| Stopping Rule | Predetermined Threshold, Conditions And Round Limit |
| Final Report | Agreement, Disagreement, Attrition And Evidence Limits |
Before starting, review the question with suitable contributors and establish the handling of personal information and confidential responses. During each round, preserve the original judgments and report material changes in wording. If a question is substantially revised, distinguish the new question from the earlier one rather than treating the responses as directly comparable.
Finally, separate the study’s findings from the decision made afterward. A panel may agree on a plausible estimate or recommend a priority, while the responsible organization still needs to examine feasibility, applicable requirements and actual evidence. The Delphi method improves the structure of expert judgment; it does not transform judgment into certainty.
An additional useful check concerns the method of presenting feedback. If panelists receive only a single recommended number, they may mistake it for an authoritative answer. Present the distribution and meaningful reasons, including contrasting interpretations. Keep the feedback consistent with the study’s confidentiality commitments. The aim is informed reconsideration, not the production of agreement at any cost.
In the fictional repair-business case, the final planning record might use 19 hours as a central judgment and retain the observed second-round range of 16 to 24 hours. It should label both as panel estimates, identify the assumptions and establish a review after actual implementation. The record is valuable because a future reviewer can compare those estimates with observed work without rewriting the original judgment.
Frequently Asked Questions
What is the Delphi method?
An iterative structured process for collecting and reconsidering informed judgments.
How does Delphi differ from a meeting?
It generally collects individual responses and provides controlled feedback across rounds.
Does Delphi require anonymity?
Individual judgments are commonly anonymized to other panelists; the design should explain confidentiality.
How many rounds are needed?
Use a design and stopping rule appropriate to the objective.
How can agreement be measured?
Depending on the question, use a declared measure such as response proportions or interquartile range.
Does agreement prove a forecast?
Agreement summarizes judgment and does not establish that an outcome will occur.
How should nonresponse be handled?
Report participation and examine possible attrition effects without inventing missing answers.
Can disagreement be a useful result?
Yes, it may reveal distinct scenarios or unresolved evidence.
Should feedback include minority views?
Material reasons and alternative interpretations should remain visible.
What should the final report contain?
Panel selection, question, rounds, feedback, agreement measures, limitations and unresolved concerns.