Fault Tree Analysis Examples: AND And OR Gates, Cut Sets And Probability Calculations

October 23, 2026 ·
Top Event With Two Branches And Four Basic Events

Fault tree analysis starts with a defined undesirable event and examines combinations of underlying events that could produce it. The method uses logical relationships to make the structure of a failure explicit. It can help a team distinguish a condition that causes a problem on its own from a condition that matters only when another event occurs. The original fictional examples in this guide explain fault tree construction, AND and OR gates, minimal cut sets, probability calculations and common dependencies. They concern ordinary operational reliability, such as document delivery and resource availability, and do not replace qualified engineering, safety or security assessment.

Quick Answer

Define the top event, decompose it using AND and OR relationships, identify minimal sufficient event sets and calculate probabilities only when the definitions and dependence assumptions support the model.

Table Of Contents

What Is Fault Tree Analysis?

The IBM overview of fault tree analysis describes a top-down approach that decomposes an undesirable event into contributing events through a graphical logical model. A fault tree begins with a top event, then uses intermediate events and basic events to represent how the top event could occur. The analysis can be qualitative, examining combinations of events, or quantitative when appropriate probabilities and dependency assumptions are available.

The European space reliability handbook discussion of system-level methods illustrates how logical gates represent system relationships, including redundancy. Its engineering context has specialized requirements; the simple cases below demonstrate the underlying Boolean logic without making claims about actual engineering reliability.

A fault tree differs from a failure mode list. The list may identify several possible failures and consequences, while a tree asks how specified failures relate to one chosen top event. Our risk assessment examples explain the broader evaluation of uncertainty and consequences. A fault tree focuses the investigation on the event logic rather than rating every listed risk in isolation.

Define The Top Event And The Analysis Boundary

A vague top event such as poor service is difficult to decompose meaningfully. Consider a fictional municipal archive that provides authorized copies of historical documents. The team wants to understand why an eligible copy request might remain unfulfilled at an agreed deadline. The top event is a specific request failing to reach its accepted delivery state by that deadline, under the defined operating conditions.

A different event, such as delivery of an incorrect copy, would require a different tree because its conditions and consequences differ. Combining unrelated failure outcomes into a single broad event may obscure important mechanisms. State the triggering condition, time horizon, applicable requirements and whether the event concerns an individual request, operating period or another unit.

Definition FieldFictional Archive Example
Top EventEligible Copy Request Not Accepted By Defined Deadline
UnitOne Eligible Authorized Request
Time BoundaryReceipt Through Agreed Delivery Checkpoint
In ScopeRetrieval, Preparation, Verification And Delivery
ExclusionsRequests Outside The Defined Service Scope
EvidenceAuthorized Records And Representative Process Observations

Our problem definition guide describes how a clear operational definition prevents an investigation from confusing symptoms and causes. Establish the top event before identifying underlying conditions. A proposed fault tree should not quietly change from unfulfilled requests to all delayed preparatory tasks when a convenient dataset becomes available.

Understand AND And OR Gates

An OR gate means that the output event occurs if at least one of its input events occurs, according to the model. An AND gate means that the output event occurs only when all its input events occur together under the defined conditions. These gates represent the structure of the event, not the degree to which an analyst considers each input important.

GateEvent LogicOrdinary Operational Example
ORAny Input Event Is SufficientRequired Request Information Missing Or Approved Record Unavailable
ANDAll Input Events Are RequiredPrimary Authorized Delivery Route Unavailable And Alternate Route Unavailable

Suppose a request cannot be fulfilled because neither of two authorized delivery routes is available. If either route can independently satisfy the complete delivery requirement, unavailability of both routes creates an AND relationship for that specific failure mechanism. If the second route is only suitable for some request types, that simple relationship may not hold for the entire population. Define the eligibility conditions and examine the actual alternatives.

The gate should represent sufficiency and necessity under the chosen boundary. A list of several conditions does not automatically mean OR, and the presence of redundant resources does not automatically mean AND. Our dependency mapping examples explain how joint prerequisites and alternatives can be represented separately. Use those relationships to test whether a proposed gate accurately describes the actual process.

Worked Example: Build A Simple Fault Tree

A fictional archive models two simplified ways a request could remain unfulfilled. The required approved source record may be unavailable, or both of two authorized delivery routes may be unavailable. Let C represent unavailability of the approved source record, A represent unavailability of the primary delivery route and B represent unavailability of the alternate route.

Under the illustrative assumptions, the top event T occurs when C occurs or when A and B both occur. In Boolean notation, T = C OR (A AND B). The source-record event is sufficient by itself within the simplified model. Either delivery-route failure alone is insufficient because the other route can satisfy the complete requirement.

ElementDefinition
TRequest Unfulfilled Under Modeled Conditions
CApproved Source Record Unavailable
APrimary Authorized Delivery Route Unavailable
BAlternate Authorized Delivery Route Unavailable
Intermediate EventA AND B
Top Event LogicC OR (A AND B)

This is not a complete representation of every possible archive failure. It deliberately excludes other events such as incorrect preparation or a missing authorization. If those events can independently cause the actual top event, the tree needs to be extended or its stated scope narrowed. Do not interpret a simple teaching model as an exhaustive analysis of a real service.

Trace the logic using example conditions. When A occurs but B does not, and C does not occur, the top event does not occur in the model. When both A and B occur, the top event occurs regardless of C. When C occurs, the top event occurs regardless of the delivery-route status. Checking these cases helps identify errors in gate placement.

Identify Minimal Cut Sets

A cut set is a combination of basic events sufficient to produce the modeled top event. A minimal cut set contains no unnecessary event: removing any event from that set means that the remaining set is no longer sufficient by itself. For the archive example, the minimal cut sets are the single-event set containing C and the two-event set containing A and B.

The combination A, B and C is also sufficient, but it is not minimal because either C alone or the pair A and B is already sufficient. This distinction matters because counting all sufficient combinations without recognizing their overlap can create an unwieldy or misleading description of the fault structure.

Event SetSufficient For T?Minimal?
CYesYes
A AloneNoNo
B AloneNoNo
A And BYesYes
A, B And CYesNo

A single-event cut set identifies a modeled condition that can produce the top event on its own. It does not establish that the condition occurs frequently or that it has the largest overall contribution. A multi-event cut set may also be important if its events are strongly related. The qualitative analysis guides further investigation into consequences, event likelihoods, shared conditions and opportunities for prevention.

Our 8D problem solving examples distinguish occurrence mechanisms from failures of detection. A fault tree can help organize logical combinations for investigation, but establishing that a hypothesized event actually occurred in a historical case still requires evidence.

Worked Example: Calculate Independent Event Probabilities

Suppose the archive’s hypothetical event probabilities per comparable eligible request are 0.02 for C, 0.10 for A and 0.20 for B. These are invented teaching values. Assume independence among the three events and the exact event logic already defined.

The probability that both delivery routes are unavailable is 0.10 multiplied by 0.20, giving 0.02. The top event occurs if either this combined event or C occurs. Since the combined event and C are independent under the stated assumptions, their overlap has probability 0.02 multiplied by 0.02, or 0.0004. The probability of the union is 0.02 + 0.02 − 0.0004 = 0.0396, or 3.96%.

CalculationResult
P(A AND B)0.0200
P(C)0.0200
P(C AND A AND B)0.0004
P(T)0.0396 Or 3.96%

Adding the two sufficient event probabilities without subtracting their overlap would give 4%, a slightly larger number. For rare events, summing probabilities is sometimes used as an approximation, but its suitability depends on the actual model. The exact union rule avoids counting the overlapping event twice.

Our expected value examples explain the importance of defining probability states and conditional outcomes. In fault tree analysis, all probabilities must refer to compatible event definitions and time periods. A monthly failure probability cannot simply be multiplied by a probability per request without establishing a coherent joint model.

Worked Example: Two Events Are Not Independent

A fictional sports club has two authorized ways to confirm a scheduled equipment reservation. The first relies on one coordinator, while the second relies on another. Both coordinators require access to the same approved reservation record. The presence of two people does not establish two independent ways of completing the required confirmation when the shared record is unavailable.

Suppose the shared record is unavailable with an illustrative probability of 0.03 per relevant request. Given that it is available, the conditional probability that the first coordinator route is unavailable is 0.10, and the conditional probability that the second route is unavailable is 0.20. Assume conditional independence of the two routes when the shared record is available.

Under this model, the confirmation failure event occurs if the shared record is unavailable, or if the record is available and both coordinator routes are unavailable. The probability is 0.03 + 0.97 × 0.10 × 0.20 = 0.0494, or 4.94%. This conditional construction accounts for the shared dependency explicitly.

Multiplying 0.10 by 0.20 and reporting 2% as the overall modeled failure probability would omit the shared record condition. The difference illustrates why independent basic-event assumptions need evidence. Our system boundaries and mapping guide describes recognizing dependencies outside the immediate activity. A tree may need to represent a common cause directly rather than duplicate it as though each route had an unrelated failure.

Worked Example: Repeated Events And Overlap

Consider a simplified model in which a delayed output occurs when event A and event B occur together, or when event A and event C occur together. The Boolean expression is T = (A AND B) OR (A AND C). This is equivalent to A AND (B OR C). The repeated appearance of A represents the same underlying event, not two separate independent events.

If A, B and C have independent illustrative probabilities of 0.10, 0.20 and 0.30, then P(B OR C) equals 0.20 + 0.30 − 0.06 = 0.44. Multiplying by P(A) gives 0.044, or 4.4%. Adding P(A AND B), which is 0.02, and P(A AND C), which is 0.03, without subtracting their overlap would give 5%.

The overlap consists of A, B and C all occurring together, with probability 0.10 × 0.20 × 0.30 = 0.006. Subtracting that overlap gives the same result of 0.044. The repeated event matters even though all three distinct basic events are assumed independent.

For complex trees, use a suitable analysis method and qualified support. The simple arithmetic in this guide is not a replacement for formal models involving complex dependencies, time-dependent behavior, repair, sequence or other specialized reliability conditions. Preserve the exact event logic and assumptions so a reviewer can independently examine the result.

Verify The Tree And Turn Findings Into Actions

Review the top event definition, decomposition and gates with people who understand the actual process. Ask whether each gate represents a sufficient combination of its inputs, whether important conditions are omitted and whether repeated basic events represent the same underlying condition. Record hypotheses and evidence separately. A plausible tree may describe possible failures without establishing which happened in a specific incident.

A response should address a verified or relevant modeled mechanism. For the archive, improving access to the approved source might reduce the single-event cut set, while verifying an independent authorized delivery alternative might reduce exposure to the two-route combination. The appropriate decision also depends on requirements, feasibility and the actual evidence about those events.

Our root cause analysis examples explain investigating alternative explanations. Use representative authorized cases to verify important relationships without deliberately causing harmful or unauthorized failures. Document the intended function of any new control, its relevant conditions and the evidence needed before relying on it.

A gate may also depend on the time at which its input events are evaluated. For instance, a primary delivery route may be unavailable in the morning but restored before the agreed deadline. An alternate route might be unavailable only during a different part of the day. The statement that both routes were unavailable at some point during the day does not necessarily mean that they were simultaneously unavailable when delivery was required. Define the event interval and the condition relevant to the top event. Where the timing or sequence of failures materially affects the result, a static Boolean model may be insufficient. Use an appropriate method that accounts for the actual time-dependent behavior.

Reusable Fault Tree Analysis Worksheet

FieldWhat To Record
Top EventPrecisely Defined Undesirable Outcome
BoundaryUnit, Time Horizon And Operating Conditions
Basic EventSpecific Underlying Event And Evidence
Intermediate EventDefined Combination Of Lower-Level Events
GateAND, OR Or Appropriate Specialized Logic
Cut SetsMinimal Sufficient Combinations Under The Model
ProbabilityCommon Basis, Source, Dependence And Uncertainty
VerificationEvidence Supporting Relationships And Assumptions
ActionAppropriate Response, Owner And Review

A useful fault tree makes logical relationships explicit and gives reviewers a way to challenge them. Do not mistake a modeled event probability for an observed frequency or a formal assurance result. Update the tree when the process, dependencies or evidence materially change. The goal is better-supported investigation and prevention, not a deceptively precise number based on uncertain assumptions.

Frequently Asked Questions

What is fault tree analysis?

A top-down logical decomposition of a defined undesirable event into contributing events and combinations.

What is a top event?

The precise undesirable outcome the tree is intended to explain.

What does an OR gate mean?

At least one input event is sufficient for the output event under the defined model.

What does an AND gate mean?

All specified input events must occur together for the modeled output event.

What is a minimal cut set?

A sufficient set of basic events from which no event can be removed without losing sufficiency.

Can independent event probabilities be multiplied?

For a joint occurrence, multiplication applies under an appropriate independence assumption.

Why subtract overlap for an OR gate?

Overlapping events otherwise contribute more than once to the union probability.

How do common dependencies affect a tree?

They can cause several routes or controls to fail together and invalidate independence assumptions.

Does a fault tree prove a root cause?

It organizes possible logical mechanisms; actual causes require evidence.

When should a tree be updated?

When the event definition, process, evidence or relevant dependencies change.