Is/Is Not analysis describes a problem through comparison. Rather than beginning with a preferred explanation, the investigator examines what is affected and what comparable thing could reasonably be affected but is not. The distinctions help narrow the search for a cause. The original fictional examples below demonstrate how to construct a problem specification, distinguish evidence from missing observations, investigate changes and test whether a proposed explanation accounts for the full pattern. The technique is especially useful for a specific deviation in a process that previously operated acceptably, or for a difference between comparable operating routes.
Quick Answer
Specify the deviation, compare affected conditions with relevant verified unaffected conditions, identify distinctions and changes, and test explanations against the complete evidence.
Table Of Contents
- What Is Is/Is Not Analysis?
- Establish A Precise Problem Statement
- Compare What, Where, When And Extent
- Distinguish Unaffected Cases From Unknown Cases
- Identify Distinctions And Investigate Changes
- Test Candidate Explanations Against The Pattern
- Worked Example: An Inconsistent Park Reservation Status
- Avoid Treating A Contrast As Proof Of Causation
- Reusable Is/Is Not Analysis Worksheet
- Frequently Asked Questions
What Is Is/Is Not Analysis?
The American Society for Quality problem solving resources identify the Is/Is Not diagram as a Kepner-Tregoe problem specification technique. The Agency for Healthcare Research and Quality description of a Kepner-Tregoe matrix explains how to record the shortcoming, affected and unaffected conditions, and distinctions, then examine changes associated with those distinctions.
An IS statement describes an observed condition that belongs to the problem. An IS NOT statement describes a relevant comparable condition in which the problem could have occurred but has been shown not to occur under the stated observations. It is not a list of everything in the world that has not been affected. The value of the comparison comes from its relevance and similarity.
For instance, a cooperative that finds damaged printed labels on one product family gains little by noting that its unrelated accounting records are unaffected. A more useful comparison is a similar label produced under otherwise comparable conditions that does not exhibit the damage. Our problem definition examples explain how to establish the observable deviation before investigating its mechanism.
Establish A Precise Problem Statement
A fictional ceramics cooperative sells sets of decorative tiles. A recipient reports that some boxed sets contain an incorrect descriptive insert. The team needs to determine what differs from the approved condition, identify the affected population and investigate why the discrepancy occurs. The example concerns ordinary labeling, not the physical safety or structural suitability of tiles.
The initial statement that packaging is wrong is too broad. Inspection establishes that eight sets in a group of 40 contain a descriptive insert intended for another color variation. The intended inserts and set identifiers are available in the approved specification. The observed discrepancy concerns the relationship between the insert and its associated set, not necessarily damage to the tiles or incorrect quantities.
| Field | Initial Problem Specification |
|---|---|
| Object | Boxed Decorative Tile Set |
| Deviation | Descriptive Insert Does Not Match Approved Color Variation |
| Observed Scope | Eight Of 40 Inspected Sets |
| Requirement | Approved Insert Matches The Set Identifier |
| Uncertainty | Wider Exposure And Cause Not Yet Established |
An observed rate of 20% in this inspected group does not establish the defect rate throughout the cooperative. The group may have been selected because a complaint made it particularly relevant. Preserve the selection method and investigate potentially related sets through the authorized quality process. Our 8D problem solving examples explain why the investigation and any necessary interim containment must be distinguished.
The Kepner-Tregoe method overview connects comparison with recognition of patterns, distinctions and relevant changes. An effective problem statement should support this comparison without assuming that the operator, the packaging material or the specification is already known to be the cause.
Compare What, Where, When And Extent
Investigators commonly organize a problem specification by object and deviation, location, time and extent. The categories guide observation but should not force unsupported entries into a worksheet. In the tile case, the team examines comparable set types, preparation routes and observation periods. It identifies verified unaffected observations under the applicable specification.
| Dimension | IS | IS NOT |
|---|---|---|
| What | Incorrect Inserts In Blue Decorative Sets | Green Sets With Correct Inserts Under Comparable Checks |
| Where | Preparation Route B | Comparable Route A |
| When | Observed After The Latest Approved Catalog Update | Earlier Comparable Records With Correct Inserts |
| Extent | Eight Incorrect Among 40 Inspected Sets On Route B | Zero Incorrect Among 40 Comparable Inspected Sets On Route A |
The extent row includes the actual denominator and selection boundary. Zero incorrect among 40 observations does not establish that Route A is incapable of producing an incorrect insert. It establishes that the problem was not observed in that inspected group. Where the inspection method differs, that difference must be documented before drawing comparisons.
The time row must also distinguish the first observed occurrence from the first actual occurrence. A complaint received after an update may concern a set prepared earlier. The team should examine preparation records and relevant version information rather than assuming the date of the complaint is the date the mechanism began.
Our process mapping examples explain how to trace the actual route and its decision points. Use that information to identify comparable conditions. The table should be refined when the investigation reveals that two apparently similar products are prepared using materially different specifications.
Distinguish Unaffected Cases From Unknown Cases
Suppose another 30 sets are held in a separate storage area but have not been inspected. A tempting summary is that the problem affects only eight sets and the other stored sets are unaffected. The available evidence does not support that conclusion. The 30 stored sets have unknown status under the relevant acceptance criterion.
| Group | Inspected | Incorrect | Evidence Status |
|---|---|---|---|
| Route B Group | 40 | 8 | Observed Affected And Correct Cases |
| Route A Group | 40 | 0 | No Incorrect Inserts Observed |
| Separate Stored Group | 0 Of 30 | Unknown | Inspection Not Yet Performed |
The correct IS NOT comparison is the verified group of comparable sets, not the uninspected stored group. If the stored sets share the same potentially relevant preparation conditions, investigate them through the appropriate process. Do not use an absence of complaints as equivalent to an absence of defects. Some recipients may not have examined the insert, or the affected sets may not yet have been distributed.
Missing information can occur within a group as well. For example, some preparation records may lack a version identifier. Record that evidence gap separately instead of treating the undocumented cases as prepared under the newest version. Our histogram examples describe how missing observations and eligibility definitions can affect an apparent pattern. The same measurement discipline applies to categorical comparisons.
Identify Distinctions And Investigate Changes
A distinction is a relevant characteristic that differentiates an affected condition from its comparable unaffected condition. The team examines the two preparation routes and discovers that Route B uses a locally maintained insert reference, while Route A uses the approved current catalog directly. The local reference may still contain an older association between set color and insert identifier.
| Comparison | Observed Distinction | Potentially Relevant Change |
|---|---|---|
| Route B Versus Route A | Different Reference Source | Catalog Association Updated |
| Blue Versus Green Sets | Changed Insert Association For Blue Sets | Green Association Remained Unchanged |
| Recent Versus Earlier Preparation | New Catalog Effective | Local Reference Not Yet Reconciled |
These distinctions support a specific hypothesis: the updated association for blue sets was not reflected in the reference used by Route B. This is more informative than saying the catalog update caused the problem. The update may have been legitimate and correctly implemented elsewhere. The question concerns how the relevant route obtained and used the approved information.
A distinction is not necessarily causal. Route B may also operate in a different room or use different packaging materials, neither of which explains a mismatched descriptive insert under the available evidence. Evaluate whether each distinction can plausibly account for the defined deviation. Our root cause analysis examples explain how to investigate competing hypotheses without treating a possible cause as established.
Test Candidate Explanations Against The Pattern
A useful hypothesis should explain both the IS observations and the IS NOT comparisons, including the relevant timing and extent. The team develops several candidate explanations and examines what would be expected if each were true.
| Candidate Cause | Expected Pattern | Assessment |
|---|---|---|
| Incorrect Approved Catalog | Both Routes Using It Could Be Affected | Does Not Fully Explain The Route Distinction |
| Outdated Local Reference | Changed Blue Association Affected On Route B | Consistent With Current Observations |
| All Inserts Misprinted | More Comparable Product Variations Could Be Affected | Not Supported By Observed Pattern |
| Ambiguous Set Identifier | Errors Could Occur Across Relevant Routes | Requires Further Evidence |
The table organizes investigation priorities. It is not proof that the outdated local reference is the cause. A second mechanism might interact with it, and the sample may not represent every route. Inspect the actual reference, verify which version was used for affected sets and reproduce the discrepancy with an authorized fictional preparation record. Do not release deliberately incorrect material to customers as a test.
Suppose the local reference contains the previous insert association and a representative test using it selects the incorrect insert, while the approved current reference selects the appropriate one. This provides evidence supporting the mechanism under the tested conditions. The investigator should also determine why the obsolete reference remained available and why the discrepancy escaped final verification.
Our A3 problem solving examples demonstrate how to preserve the sequence of evidence, hypotheses, countermeasures and subsequent observations. An Is/Is Not matrix can be included as supporting evidence in that broader investigation rather than being treated as a complete corrective-action report.
Worked Example: An Inconsistent Park Reservation Status
A fictional parks service accepts reservations for supervised community activities. Several confirmed reservations made through an authorized assisted route display a pending status in the coordinator’s register. The team’s objective is to reconcile the actual acceptance state without changing requirements or promising availability that has not been established.
The service compares records from the assisted route with comparable records made through the ordinary route. Of 50 inspected assisted-route reservations, ten display the discrepancy. Of 60 inspected ordinary-route reservations, one displays it. This is an important difference, but the ordinary route is not a completely unaffected IS NOT group. The observations indicate a higher proportion on the assisted route, not a problem confined exclusively to it.
The rates are 20% and approximately 1.67% respectively. The difference is about 18.33 percentage points within the inspected groups. These proportions do not establish a causal effect of the route, because the groups may contain different types of requests. Investigate whether the discrepant records share a specific handoff condition that occurs on both routes.
A detailed comparison reveals that the discrepancy can occur when an accepted request is transferred through a particular authorized reconciliation process. Nine assisted-route records and the one ordinary-route record share that condition; the remaining assisted-route discrepancy requires separate investigation. Refine the problem specification rather than forcing the data to support the initial route-based explanation. Our dependency mapping guide illustrates how a shared information relationship may affect several visible service routes.
Avoid Treating A Contrast As Proof Of Causation
Suppose all eight affected tile sets were prepared during the same afternoon, while the unaffected comparison sets were prepared in the morning. A time distinction might reflect staffing, demand, reference availability or a change in product mix. The afternoon itself is not a cause. Investigate which relevant conditions differed and whether they can explain the specific deviation.
A useful next test seeks evidence that distinguishes plausible hypotheses. If the local reference is suspected, examine whether the same discrepancy can be reproduced when the reference is used under otherwise comparable conditions. If the approved catalog is suspected, verify its actual association independently. Preserve the source and authorized test conditions so another reviewer can assess the conclusion.
Sometimes the available evidence cannot distinguish between candidate explanations. In that case, leave the cause unresolved and record the next useful investigation. A concise and honest matrix is preferable to a complete-looking one filled with conjecture. Where a necessary temporary protection is already in place, preserve it until the applicable verification and authority justify a change.
Where the investigation compares different exposure levels, preserve those levels as well as the number of defects. Suppose one route prepares 500 sets and another prepares only 20 during the relevant period. Five observed discrepancies on the first route and two on the second do not establish that the first route is less reliable. If those observations cover all eligible sets under comparable checks, the rates would be 1% and 10% respectively. The route with fewer observed discrepancies could have a larger proportion affected. If the inspections were selected rather than comprehensive, document how the selection affects that comparison. An extent row should support meaningful comparison rather than reward whichever route has fewer total opportunities for failure.
The analysis should also distinguish changes in the object from changes in the observation process. If a new inspection procedure begins identifying mismatched inserts that an earlier check would not have detected, an increase in recorded defects could reflect better detection rather than a newly introduced occurrence mechanism. Examine the earlier inspection criteria and records before asserting that the underlying process changed on the date the observed count increased. This distinction helps the team investigate both occurrence and escape mechanisms without overlooking the effect of measurement.
After identifying a plausible occurrence mechanism, compare the final acceptance arrangements for the affected and unaffected groups. Suppose both routes use the same quantity check, but only Route A checks the insert identifier against the set identifier. That distinction could explain why a mismatch on Route B reaches a recipient, even if an incorrect selection is occasionally possible on both routes. A revised selection reference and a verified acceptance check address different mechanisms. Evaluate the need for each response rather than assuming that one correction covers every aspect of the problem.
A small test can be designed to distinguish these mechanisms without producing customer-facing defects. Use authorized example records representing a changed insert association, an unchanged association and an unresolved specification. Determine whether each preparation route identifies the expected insert and whether the acceptance arrangement recognizes a mismatch. Record the result for each condition separately. If a test confirms the proposed mechanism only for blue sets using the outdated reference, the conclusion should retain that boundary. Further examination may be necessary for other set types or routes. This preserves the distinction between a demonstrated mechanism and a general assertion about the entire operation.
Reusable Is/Is Not Analysis Worksheet
| Field | What To Record |
|---|---|
| Problem Statement | Object, Observable Deviation And Required Condition |
| What | Affected And Comparable Verified Unaffected Objects |
| Where | Relevant Locations, Routes Or Process Conditions |
| When | Observation Dates, Operating Periods And Known Changes |
| Extent | Counts, Denominators And Relevant Severity |
| Distinctions | Evidence-Based Differences Between Compared Conditions |
| Changes | Relevant Changes Associated With Those Distinctions |
| Hypotheses | Candidate Causes And Predicted Patterns |
| Verification | Supporting, Contradictory And Missing Evidence |
| Next Decision | Investigation, Correction, Owner And Review |
Review the matrix as new information becomes available. Preserve original observations and document why comparisons or hypotheses were revised. Do not confuse the number of rows completed with the quality of the investigation. A useful Is/Is Not analysis narrows the search for a plausible mechanism, identifies contradictory evidence and makes the next verification task clear. It remains valuable even when it disproves the team’s initial explanation rather than confirming it.
Frequently Asked Questions
What is Is/Is Not analysis?
A problem-specification method comparing affected conditions with relevant verified unaffected conditions.
What belongs in the IS column?
Observed facts describing the defined problem.
What belongs in the IS NOT column?
Comparable conditions in which the problem could reasonably occur but was not observed.
What are the common dimensions?
What, where, when and extent, with relevant distinctions and changes.
Does an uninspected item belong in IS NOT?
Record it as unknown until suitable evidence establishes its status.
What is a distinction?
A relevant observed difference between affected and comparable unaffected conditions.
Does a distinction establish causation?
It supports a hypothesis that must be investigated and tested.
Can both groups contain affected cases?
Report the observed difference and refine the scope rather than claiming complete separation.
How does the method support 8D?
It can strengthen the problem specification and subsequent cause investigation.
When should the matrix be revised?
When verified observations, relevant changes or hypothesis tests alter the problem specification.