Kanban Board Examples: Work In Progress Limits, Pull Systems And Flow Metrics

October 8, 2026 ·
Four Workflow Columns With Work In Progress Cards

A Kanban board makes the state of work visible so that people can manage flow instead of merely starting more tasks. It shows which items are waiting, which have entered the defined workflow, which require attention and which have reached the agreed finish condition. A board alone does not create a Kanban system. Its policies, work-in-progress controls and feedback practices determine how it supports delivery. The fictional examples in this guide show how to design a board for a small archival service, calculate flow measures, address blocked work and improve a workflow without confusing local activity with accepted outcomes.

Quick Answer

Define the workflow, visualize actual states, control started unfinished work, pull new items when capacity exists, measure flow and improve the policies using evidence.

Table Of Contents

What Is A Kanban Board?

The Kanban Guide describes Kanban as a strategy for optimizing the flow of value through a visual, pull-based system. Kanban University’s guide to the Kanban Method also emphasizes visualization, limiting work in progress, managing flow, explicit policies, feedback and collaborative improvement. A physical or electronic board may represent these practices, but the visual representation is only one part of the system.

A board should reflect the actual workflow rather than reproduce a generic list of To Do, Doing and Done columns when those labels conceal important handoffs. A small service might distinguish a request awaiting clarification from a prepared request awaiting independent acceptance. Both items remain unfinished, but they require different responses. The appropriate design depends on the decision the team needs to make.

Our process mapping examples explain how to identify work routes, activities and decision points. Use that understanding to determine which states should appear on a Kanban board. A useful column represents an observable state of work, not merely a department name or a person assigned to the item.

Define A Workflow And Its Boundaries

A fictional municipal archive provides authorized copies of historical records. Eligible requests may need source identification, preparation, verification and accepted delivery. The team discovers that several prepared items wait for verification while additional preparation continues, making it difficult to recognize which requests need attention first.

The team defines a work item as one eligible copy request with an identifiable outcome. A request enters the active workflow when its required initiating information is available and the team deliberately starts it. It finishes when the authorized delivery acceptance condition is established. Requests waiting for eligibility clarification before active work starts are visible but do not belong to the same active work-in-progress count.

Board StateEntry ConditionExit Condition
ReadyEligible Request Available To StartCapacity Exists And Request Is Pulled
PreparationActive Work Has StartedRequired Copy Prepared
VerificationPrepared Copy Awaits Or Undergoes ReviewRequired Acceptance Established
DeliveryVerified Copy Awaits DeliveryAgreed Delivery Condition Met
FinishedDefined Outcome AcceptedArchived According To Agreed Policy

The start and finish conditions matter because they define the population for the flow measures. If the team moves items into Finished immediately after preparation, it would omit verification and delivery from the measured cycle. This might make the reported cycle time look shorter without improving the service. Our problem definition guide explains the importance of precise measurement boundaries.

A card may contain the request identifier, current state, start date, relevant deadline, required information and an indication of unresolved conditions. Display only the information necessary for the intended coordination. Confidential or restricted records should not be copied onto a shared board simply because a card has space for them.

Worked Example: Set And Apply Work-In-Progress Limits

Work in progress, or WIP, includes items that have started but have not reached the defined finish point. It includes waiting and blocked work within that boundary, not just items on which a person is actively working. The archive establishes an illustrative system-wide limit of six started items. It also sets local controls of three in preparation, two in verification and two in delivery. The global limit still applies even though the local limits sum to seven.

StateCurrent ItemsLocal Limit
Ready8Not In Active WIP
Preparation33
Verification22
Delivery12
Active WIP6System Limit Of 6

The preparation and verification columns have reached their local controls, and the overall system has six active items. Starting an additional ready request would exceed the system limit. The team should examine how existing work can move toward completion. For example, if the delivery item reaches its finish condition, active WIP falls to five. This creates system capacity, although preparation still cannot accept another item until its own applicable limit allows it.

A verification item might then move to delivery, leaving one verification position available. An appropriately prepared item can move from preparation into verification if its entry condition is satisfied. Preparation now contains two items, and the team may pull another eligible request if the global capacity and applicable selection policy permit it.

The example illustrates why a pull system is different from pushing work into every available department. Local activity is not the objective. Our bottleneck analysis examples show how a limiting stage can determine the flow of the whole system. Starting additional work upstream may create a larger queue rather than increase accepted delivery.

Make Blocked Work And Waiting Visible

Suppose one preparation item requires an approved source identifier that cannot currently be verified. The team marks that item as blocked and records the responsible follow-up and next relevant review. The item remains started and unfinished, so it still counts toward active WIP. Removing it from the count merely because it is waiting would misrepresent the actual inventory of work.

The board can distinguish between an ordinary queue and a specific unresolved condition. A card waiting for its turn at verification may be in a normal queue. A card that cannot be verified because the required source is unavailable has a different problem. Both affect flow, but the responses may differ.

Our dependency mapping examples explain how common resources and information can affect several work items. If multiple blocked requests rely on the same unavailable reference, examining that dependency may be more useful than repeatedly changing the priority of each individual card.

An explicit policy should define how legitimate exceptions are handled. An unusually urgent eligible request may require an authorized priority decision. If the team repeatedly overrides its WIP controls to accommodate urgent work, investigate the actual demand, capacity and policy. The board should show those exceptions rather than hide them by inventing a separate category of work that does not count.

Worked Example: Calculate Throughput And Cycle Time

The Scrum.org Kanban guide explains four basic flow measures: WIP, throughput, work-item age and cycle time. These measures depend on the defined start and finish boundaries. Throughput is a count of finished items during a specified period. Cycle time is elapsed time from start to finish for a completed item. Work-item age is elapsed time since start for an unfinished item.

Suppose the archive finishes six comparable requests during one operating week. Their individual cycle times are two, three, three, four, six and six operating days. The total of these six measured cycle times is 24 days, and their arithmetic mean is four days. The median is 3.5 days because the middle observations are three and four.

MeasureFictional Observation
Throughput6 Finished Requests In The Week
Completed Cycle Times2, 3, 3, 4, 6, 6 Days
Mean Cycle Time4 Days
Median Cycle Time3.5 Days
Greatest Observed Cycle Time6 Days

Do not report six divided by four as the throughput of this system. The six completions occurred during a week, while the four-day average describes elapsed durations of individual items, which may have overlapped. Distinguish counts per period from item durations.

Suppose the team has an unfinished request that started seven operating days before today’s review. Its age is seven operating days even though its final cycle time is not yet known. Compare age with relevant historical observations and service expectations to decide whether the item needs attention. Do not exclude older unfinished work from investigation simply because its cycle time cannot yet be calculated.

Worked Example: Reconcile Starts, Finishes And WIP

Consider another week in which the archive begins with five started unfinished items. It starts seven additional items and finishes six. Assume no cancellations, reopening or movement outside the defined measurement boundary. The ending WIP is five plus seven minus six, or six items.

Flow RecordCount
Starting WIP5
New Starts7
Finished Items6
Ending WIP6

This reconciliation describes the change in the active stock across the period. It does not imply that seven items were active simultaneously. The timing of starts and finishes determines whether the WIP policy was respected at each point. The team must examine the actual sequence if it needs to verify adherence to the limit.

Our behavior over time graph examples explain how an accumulated quantity can increase even when completion counts improve. A cumulative flow diagram can help show changes in the number of items occupying different workflow states over time. The usefulness of the chart depends on the consistency of the recorded states and boundaries.

If an active item is legitimately canceled, record the adjustment separately rather than counting it as a successfully finished item. A cancellation may reduce WIP without delivering the intended outcome. A reopened item requires an agreed treatment that preserves meaningful cycle-time and throughput definitions. Otherwise the team may inadvertently count one delivered outcome twice.

Worked Example: Interpret A Service Level Expectation

A service level expectation is a forecast concerning the time in which items are expected to flow from start to finish. It is not an unconditional promise for every item. Suppose the archive examines 20 completed comparable requests and observes that 17 finished within five operating days. In that particular sample, 85% completed within five days.

The team may use this observation as a preliminary basis for a five-day expectation for approximately 85% of comparable work, provided the evidence and operating conditions support that use. Twenty observations are limited, so the historical proportion should not be presented as a precise guarantee of future performance.

The relevant boundary is the defined active cycle, not necessarily the entire time since a person first requested assistance. If a request waits three days before it becomes eligible to start and then spends four days in the active workflow, the recipient may experience seven days under the simplified elapsed-time convention. The active cycle is only four days.

Our value stream mapping examples explain the difference between end-to-end lead time and the time associated with particular processing stages. A Kanban team should select measures that reflect both its ability to manage active work and the actual service experience.

Improve The Board Through Evidence

A fictional cooperative that prepares exhibition display packs initially limits preparation to three active items. The team observes that items frequently wait for a shared authorized reviewer. Increasing the preparation limit to five would allow two more items to enter that state, but it would not automatically create reviewer capacity. Instead, examine whether the preparation sequence produces suitable review-ready work, whether the reviewer is available at useful times and whether legitimate work can be reorganized.

Our resource allocation examples discuss the need to distinguish nominal availability from usable capacity. A WIP policy should support the actual operating arrangement. A very low limit may leave a resource unable to work when a predictable dependency is unavailable; an excessively high limit may allow long queues and obscure priorities. Test changes against actual flow and acceptance outcomes.

Suppose a bounded trial reduces average active WIP from eight to six while comparable weekly throughput remains six. The observed reduction in WIP is 25%. That alone does not establish that every request becomes faster, because the distribution of cycle times and the mix of requests may change. Review throughput, age, cycle-time observations, service outcomes and the practical workload before deciding whether to retain the policy.

A useful review also investigates the items that do not follow the ordinary pattern. One long-running request may contain a legitimate special requirement. A series of old items with the same missing information may indicate a recurring process condition. The board makes the issue visible, while an investigation is needed to understand its mechanism. Our A3 problem solving examples describe preserving evidence and testing changes systematically.

The choice of work-item size also influences the usefulness of the measures. If one card represents an individual request while another represents a large group of unrelated requests, counting both as one completion may obscure a change in the composition of throughput. Define meaningful work-item types and examine them separately when their sizes differ substantially. Do not divide a large item into smaller cards solely to increase the reported completion count; each card should correspond to a legitimate unit of managed work or an agreed subcomponent.

The selection policy at the ready queue needs similar attention. A first-in-first-out rule may be suitable for some comparable requests, while a service with legitimate deadlines or dependencies may require another explicit policy. Define when an authorized priority change is appropriate and preserve the reason. Repeatedly selecting only the easiest requests may improve reported short-cycle completions while older, more difficult eligible work remains unresolved. Review work-item age and the service experience together so the metrics support the actual objective.

Reusable Kanban Board Worksheet

FieldWhat To Record
Work ItemDefined Unit And Intended Accepted Outcome
Start And FinishObservable Workflow Boundaries
StatesActual Conditions And Transition Policies
WIP ControlSystem Or Local Controls And Exception Policy
PullSelection And Capacity Conditions
BlockersReason, Responsible Follow-Up And Review
MetricsWIP, Throughput, Cycle Time And Work-Item Age
ReviewEvidence, Balancing Measures And Proposed Improvement

A board becomes useful when the team can use it to make better decisions about the work already in progress. Keep its states and policies understandable, preserve the actual flow data and revise the arrangement when evidence shows a better way to deliver accepted outcomes.

Frequently Asked Questions

What is a Kanban board?

A visual representation of work states and policies used to manage the flow of work.

What is WIP?

Work started within the defined workflow that has not yet finished.

Do blocked items count as WIP?

They remain WIP while started and unfinished.

What is a pull system?

Work is selected when the relevant capacity and applicable policy permit it.

How is throughput measured?

Count finished work items during a defined period.

What is cycle time?

Elapsed time from the defined start to the defined finish of a completed item.

What is work-item age?

Elapsed time since an unfinished item started.

What is a service level expectation?

A forecast of flow time expressed with an appropriate probability or proportion.

Does a WIP limit guarantee faster delivery?

Its effect depends on the actual workflow, demand and resources.

When should a board be changed?

When evidence supports improving the states, policies, controls or flow arrangements.