Function analysis examines what a product, service or process must accomplish rather than beginning with the components of its existing design. That change of perspective can help a team discover alternatives that would otherwise remain hidden. The Function Analysis System Technique, commonly called FAST, organizes functions through logical how-and-why relationships. The original fictional examples in this guide show how to define basic and supporting functions, build a small function logic chain, allocate costs without double counting and evaluate alternative concepts against the actual required outcomes.
Quick Answer
Describe what the subject must do using concise function statements. Identify its basic function, examine how and why functions relate, retain necessary supporting conditions and develop alternative ways of providing them.
Table Of Contents
- Describe Functions Instead Of Existing Components
- Worked Example: A Reusable Information Display
- Identify Basic And Supporting Functions
- Build A Simplified FAST How-And-Why Chain
- Worked Example: Identify A Missing Supporting Function
- Worked Example: Allocate Costs To Functions
- Compare Alternative Concepts Against Functions
- Apply Function Analysis To An Administrative Service
- Verify Functional Coverage Before Selecting A Design
- Reusable Function Analysis And FAST Worksheet
- Frequently Asked Questions
Describe Functions Instead Of Existing Components
SAVE International’s Function Analysis Guide identifies function analysis and FAST as important parts of value methodology. A function describes what the subject does or needs to do. A common drafting convention uses an active verb and a measurable or understandable noun, such as identify material, retain information or support a display.
The phrase install a metal bracket identifies a particular implementation. Support a display identifies a function that might be achieved through several appropriate designs. Separating those statements creates room for alternative solutions while keeping the underlying purpose visible.
Our problem definition examples similarly distinguish a required outcome from an assumed solution. Function analysis applies this reasoning to the individual functions and their relationships. A useful function statement should be sufficiently abstract to permit genuine alternatives but sufficiently clear to guide evaluation.
Not every function needs to describe a physical mechanism. An administrative arrangement might establish eligibility, match records or convey a decision. A product might retain information, support a component or indicate a condition. In each case, connect the function to a defined subject and scope.
Worked Example: A Reusable Information Display
A fictional community heritage association uses a small freestanding display for approved historical information cards at indoor exhibitions. The association wants to examine the design of the display arrangement because replacing its information cards currently involves unnecessary preparation effort.
The initial proposal is to buy another display made from the same type of material. Before evaluating that solution, the team defines the subject of the function study as the arrangement that presents an approved information card at a designated exhibition point. It excludes the creation of the historical text itself but includes the means of presenting and replacing the card.
| Existing Feature Or Activity | Function Statement |
|---|---|
| Display Frame | Support Card |
| Card Slot | Retain Card |
| Printed Identifier | Identify Card |
| Placement Arrangement | Present Information |
| Replacement Procedure | Enable Replacement |
The function statements describe what the existing features contribute. They do not establish that each feature must be retained. A new design might provide two functions through one component, while another might separate them. The required functions remain the basis of comparison.
The association should establish actual placement, readability and other applicable conditions before recommending a design. A function such as support card does not specify the dimensions or load conditions needed to evaluate a real physical arrangement. The example concerns conceptual analysis rather than technical instructions for constructing or certifying a display.
Identify Basic And Supporting Functions
A basic function expresses the central purpose of the subject within the defined scope. In the heritage association’s example, present information could be treated as the basic function if the scope covers the complete display arrangement. A more narrowly scoped study of the holder might instead define support card as its basic function.
This difference illustrates why the study boundary matters. The same component can be examined in relation to several different objectives. The basic function depends on the subject under review and the intended purpose, not on a fixed classification independent of the study.
Supporting functions help provide the basic function or satisfy other relevant conditions. Retain card, identify card and enable replacement can support the complete display arrangement. Some secondary functions may be essential because they represent applicable requirements. Secondary does not mean optional or unimportant.
Our requirements traceability matrix examples show how required conditions can be connected to work and verification evidence. When a function supports a mandatory requirement, preserve that link instead of removing the function because it is not the basic one.
A useful distinction concerns functions that are created by the current design. Suppose the existing display requires a separate internal reference sheet solely because its card identifiers are difficult to distinguish. The function of matching that sheet to each card might become unnecessary under a different arrangement. Investigate the actual underlying need rather than preserve every existing supporting activity automatically.
Build A Simplified FAST How-And-Why Chain
The Canadian Society of Value Analysis FAST explanation describes using how and why relationships to expand functions and check the logic of the diagram. In a conventional orientation, higher-order purposes appear toward the left and lower-order means toward the right. The actual arrangement should follow the appropriate FAST convention and study scope.
For the information display, the team develops a small illustrative chain. The higher-order purpose is communicate history. The basic function within the display scope is present information. Supporting means include support card and retain card.
| Position | Function | Question Linking To Next Function |
|---|---|---|
| Higher-Order Purpose | Communicate History | How Is Information Communicated? |
| Basic Function | Present Information | How Is The Approved Card Presented? |
| Supporting Means | Support Card | How Is The Card Supported In Position? |
| Lower-Level Means | Retain Card | Why Is The Card Retained? |
Read the proposed chain in both directions. From left to right, the team asks how the function is achieved. From right to left, it asks why the lower-order function is needed. Retaining a card can support its positioning, supporting the card can enable presentation, and presenting information contributes to communication of history.
The simplified chain is not intended to replace a complete formal FAST diagram with its applicable scope lines, simultaneous functions and classifications. It demonstrates the how-and-why logic. Review the actual relationships with people who understand the subject and investigate any link that cannot be explained convincingly.
The sequence is functional rather than chronological. Retaining a card and supporting it can occur at the same time. A process flowchart would show when a card is inserted or replaced; FAST describes why the relevant functions exist and how they support the purpose. Our tree diagram examples discuss hierarchical relationships, which can complement function analysis where several specific requirements support one objective.
Worked Example: Identify A Missing Supporting Function
Suppose the first concept for the heritage display uses a reusable holder that presents and retains a card. The team initially overlooks the need to identify whether the installed card is the current approved version.
When the association introduces a revised historical description, a volunteer may replace one card while another older card remains installed elsewhere. The display still physically presents information but may not present the correct applicable information. The team therefore identifies establish currency or identify version as a relevant supporting function.
The finding does not prescribe one particular version label or document system. Several suitable arrangements might establish the condition. The function analysis helps identify the actual need so that alternative designs can address it deliberately.
Our quality control plan examples explain why an appropriate observation method and response need to be connected to the characteristic being controlled. Function analysis identifies the need; a control plan can describe how the current information is established and what happens when its version is unresolved.
A separate supporting function might concern replacing the card without requiring a complete redesign. If that flexibility is genuinely important to the association, define how it will be evaluated. A phrase such as easy to replace may need an observable task condition, relevant users and an appropriate measure of replacement effort.
Worked Example: Allocate Costs To Functions
A fictional stationery supplier examines a reusable sample presentation arrangement. Its current estimated cost for one complete display is $120. The estimate includes a holder, printed information, an identification element and preparation effort. The team wishes to understand which functions consume the resources.
| Cost Element | Total Cost | Illustrative Function Allocation |
|---|---|---|
| Holder | $50 | $35 Support Card; $15 Retain Card |
| Printed Information | $30 | $30 Present Information |
| Identification Element | $10 | $10 Identify Version |
| Preparation Effort | $30 | $20 Present Information; $10 Enable Replacement |
| Total | $120 | $120 |
The allocations are fictional judgments about the contribution of each cost element. Summing them by function gives $35 for support, $15 for retention, $50 for presentation, $10 for version identification and $10 for enabling replacement.
A component that supports several functions should not have its entire cost assigned to every function when the aim is a reconciled total. If the $50 holder were counted fully under both support and retention, the analysis would overstate the total cost by $50. Use a transparent allocation convention and recognize where an allocation is uncertain.
Our cost of quality examples demonstrate why resource categories and boundaries need to be reconciled. Function-based cost analysis has a similar requirement. Its purpose is to support investigation, not to produce a precise-looking allocation unsupported by the actual work.
The highest-cost function is not necessarily the first function that should be removed. Presenting information is the purpose of the arrangement in this example. The useful question is whether the required presentation can be achieved more effectively through a different concept while preserving applicable conditions.
Compare Alternative Concepts Against Functions
The stationery supplier develops three possible arrangements. Concept A retains the existing display format with a revised reference arrangement. Concept B uses a different reusable holder with a clearly distinguishable current-card identifier. Concept C combines several presentation cards into an appropriately organized shared display.
| Required Function | Concept A | Concept B | Concept C |
|---|---|---|---|
| Present Information | Candidate Coverage | Candidate Coverage | Candidate Coverage |
| Support And Retain Cards | Candidate Coverage | Candidate Coverage | Requires Review |
| Identify Current Version | Requires Review | Candidate Coverage | Candidate Coverage |
| Enable Replacement | Requires Review | Candidate Coverage | Requires Review |
The table represents proposed coverage rather than demonstrated compliance. Each concept needs suitable evidence of the required functions. Concept C might reduce the number of holders but make individual cards less accessible or more difficult to replace. The team should evaluate those consequences rather than assume that fewer components establish greater value.
Our morphological analysis examples describe combining alternative means of providing several functions. The function model can supply the dimensions for that exploration. For example, the team may examine alternative ways of supporting cards, identifying versions and allowing replacement, then screen combinations for compatibility.
Suppose Concept B has a modeled cost of $95 compared with the original $120. The conditional difference is $25, about 20.8%. That comparison is meaningful only if the costs have compatible boundaries and the concept can satisfy the necessary functions. If Concept B requires $40 of additional maintenance not included in the estimate, the original cost advantage may disappear.
Our trade-off analysis examples show why alternative outcomes and resource consequences should be made explicit. Function analysis helps keep the required outcomes at the center of the comparison.
Apply Function Analysis To An Administrative Service
Consider a fictional local language society that provides an approved event registration confirmation. Its existing process uses three administrative forms. A preliminary proposal suggests merging them into one, but the team has not yet examined the functions each form supports.
One form identifies the request, another establishes the applicable event availability and a third records the accepted confirmation. The functions might be described as identify request, establish availability and convey confirmation. A single record may be able to provide all three functions, or a separate controlled record might remain necessary for a particular decision.
The team also identifies a supporting function: distinguish unresolved status from accepted status. If the merged form cannot represent those conditions accurately, the apparent simplification would undermine the intended result. Our decision table examples show how several conditions can determine a legitimate outcome.
This case illustrates why function analysis is not a mechanical exercise in eliminating forms, components or work steps. Examine whether each proposed change preserves the actual function and requirements. A more integrated arrangement may simplify work, but it must still establish the relevant conditions.
Verify Functional Coverage Before Selecting A Design
A candidate design can appear to satisfy a function on a diagram without having demonstrated that performance. Define suitable acceptance evidence for each consequential requirement. For the heritage display, a representative observation might establish whether an approved card can be located, presented and replaced under the agreed exhibition conditions.
Our acceptance criteria examples describe the distinction between the intended outcome and the evidence needed to recognize it. The function statement should be connected to a requirement and verification method before the team treats the candidate arrangement as established.
Review changes in the study boundary as well. A proposal might reduce the cost of the holder but shift substantial preparation work to the historical information team outside the original scope. That effect may still matter to the organization. Preserve the boundary of the function analysis while examining consequential changes outside it.
The function model can also reveal conflicting requirements. One arrangement might make cards very easy to remove, while another maintains their position more reliably. Both functions may be important. Clarify the applicable operating conditions and investigate a suitable compromise rather than assume that maximizing one function independently will improve the complete design.
Reusable Function Analysis And FAST Worksheet
| Field | Record |
|---|---|
| Subject | Product, Process Or Service Under Study |
| Scope | Included Functions And Relevant Exclusions |
| Basic Function | Central Purpose Within Scope |
| Supporting Functions | Necessary Means And Other Requirements |
| Logic | How-And-Why Relationships |
| Current Means | Existing Components Or Activities |
| Function Costs | Compatible Allocations And Assumptions |
| Alternatives | Different Ways To Provide Required Functions |
| Verification | Actual Functional Coverage And Relevant Consequences |
A useful final review selects one function and asks whether it is expressed as a solution rather than a required result. If the statement says use a particular device, investigate whether the device is genuinely required or whether another means could provide the same function. Then examine whether the revised statement remains specific enough to verify.
Function analysis is valuable when it helps a team develop better ways of achieving an established purpose. Use the how-and-why relationships to clarify the role of each function, preserve applicable requirements and evaluate candidate means with suitable evidence. The best outcome is a more useful arrangement, not simply a diagram containing fewer functions.
Frequently Asked Questions
What is function analysis?
Examining what a subject must do independently of its existing implementation.
What is FAST?
Function Analysis System Technique, which organizes functions through logical relationships.
What is a basic function?
The central purpose of the subject within the defined study scope.
How should functions be written?
Use concise action-and-object statements where they clarify the required function.
What do how and why mean in FAST?
How explores supporting means; why traces a function toward its purpose.
Is FAST a process flowchart?
No, its relationships concern function logic rather than necessarily chronological order.
Are secondary functions always optional?
They may support essential requirements and must be reviewed.
How are function costs allocated?
Use a documented convention that reconciles with the actual total cost.
Does a lower-cost concept necessarily provide better value?
Check functional coverage, other consequences and the complete relevant cost boundary.
What should be verified?
Actual performance of the required functions under the applicable conditions.